SWOC : An Amazing Open Source Journey
There was a limit of maximum 3 projects. Projects that I selected 1. FACE-X - 1 PR merged 2. Dezenix - 13 PRs merged 3. ML Crate - 0 PRs merged
Created on 23rd February 2022
•
SWOC : An Amazing Open Source Journey
There was a limit of maximum 3 projects. Projects that I selected 1. FACE-X - 1 PR merged 2. Dezenix - 13 PRs merged 3. ML Crate - 0 PRs merged
The problem SWOC : An Amazing Open Source Journey solves
-
In FACE-X I contributed one face morphing algorithm which helps in morphing the face of 2 people.
-
I contributed Frontend components in Dezenix repository which can be used as it is in while developing the frontend which will reduce the time required to develop user interface.
Challenges I ran into
- Project selection:
As there was limit of maximum 3 projects I was very confused about project selection. But as the time to select projects was a week long, I decided to choose one project in which I can contribute very well e.g. Dezenix and others two in which I can contribute after learning those things e.g. ML Crate and FACE-X.
- Score updation:
Some of the project admins didn't updated the scoresheet on time. So I had to contact them peronally on discord and after that some of them updated the score sheet.