S

SWOC : An Amazing Open Source Journey

There was a limit of maximum 3 projects. Projects that I selected 1. FACE-X - 1 PR merged 2. Dezenix - 13 PRs merged 3. ML Crate - 0 PRs merged

Created on 23rd February 2022

S

SWOC : An Amazing Open Source Journey

There was a limit of maximum 3 projects. Projects that I selected 1. FACE-X - 1 PR merged 2. Dezenix - 13 PRs merged 3. ML Crate - 0 PRs merged

The problem SWOC : An Amazing Open Source Journey solves

  1. In FACE-X I contributed one face morphing algorithm which helps in morphing the face of 2 people.

  2. I contributed Frontend components in Dezenix repository which can be used as it is in while developing the frontend which will reduce the time required to develop user interface.

Challenges I ran into

  1. Project selection:

As there was limit of maximum 3 projects I was very confused about project selection. But as the time to select projects was a week long, I decided to choose one project in which I can contribute very well e.g. Dezenix and others two in which I can contribute after learning those things e.g. ML Crate and FACE-X.

  1. Score updation:

Some of the project admins didn't updated the scoresheet on time. So I had to contact them peronally on discord and after that some of them updated the score sheet.

Discussion

Builders also viewed

See more projects on Devfolio